Protecting Life Science Shipments When Failure Isn’t an Option

Temperature-controlled transportation, validated equipment, and advanced security solutions designed for pharmaceutical, biotech, and healthcare supply chains.

A circular clock icon with the numbers "24/7" in the center, indicating round-the-clock availability.

24/7

Operations Support

Shield icon with a stopwatch and a diagonal line across it, symbolizing disabled or protected stopwatch functionality.

TAPA

Level I Certified

A blue map location pin icon on a background with a gradient transitioning from black to bright cyan.

Nationwide

Coverage Network

A digital illustration of a computer monitor displaying a line graph with an upward trend.

Real-Time

Shipment Visibility

Neon-style thermometer icon with pink, blue, and yellow colors.

Temperature Controlled

Validated & Monitored

Outline of a person with a circle for a head and simple body, depicted in blue, with text boxes around it suggesting a profile or user interface

TSA Certified

Professional Drivers

OUR SOLUTIONS

Icon of a thermometer indicating high temperature, enclosed in a blue circle.

Temperature-Controlled Logistics

Ensure product integrity with validated equipment, real-time monitoring, and precise temperature management

A blue shield with a crossed-out circle and line symbol in the center, indicating no blocking or restriction.

Security & Risk Management

TAPA Level 1 Certified transportation with advanced security measures to protect your high-value shipments.

Outline of a delivery truck with a clock on its side.

Asset-Based Transportation

Dedicated fleet of refrigerated tractors and trailers ensuring capacity, reliability, and complete control.

Computer monitor displaying a graph with an upward trend, a mountain landscape, and a bar chart with increasing bars, symbolizing data analysis and growth.

QLS PTMS

(Managed Transportation)

End-to-end transportation management with qualified carrier partners, visibility, and performance oversight.

TWO WAYS TO WORK WITH QLS

Comparison of asset-based transportation and QLS managed transportation with bullet points on each side and a background of people working at computer screens showing world maps.

HOW QLS PROTECTS YOUR SHIPMENT

A logistics process infographic with five steps: 1. Planning - customizing logistics plan. 2. Monitoring - real-time tracking and temperature monitoring. 3. Securing - advanced security measures. 4. Transport - asset-based fleet for temperature-controlled transport. 5. Delivery - online final delivery with complete visibility and proof of delivery.

NEW

Introducing QLS PTMS

Pharmaceutical Transportation Management Solutions

A smarter way to manage pharmaceutical transportation. Combining the strength of our asset-based fleet with a qualified carrier network and industry-leading technology for complete supply chain visibility and control.

The image features a minimalist, digital-style logo with a circular border, containing a stylized person icon and a location pin symbol. The background is black with colorful glitch effects in yellow, purple, and pink.

Single Point of Accountability

Outline of a bar chart with ascending bars and an upward trending arrow, with a dollar sign at the end.

Lane & Cost Optimization

A technical diagram of a mechanical device, possibly a valve or pump, with various labeled parts and color-coded sections.

Temperature Controlled Capacity

Outline drawing of a construction worker wearing a safety helmet and vest.

Partner Carrier Qualification Program

TEMPERATURE CONTROLLED LOGISTICS & MONITORING

We provide industry-leading temperature service technology and monitoring to ensure the integrity of your temperature-sensitive shipments.

Our real-time temperature monitoring system also includes remote control capabilities, allowing for precise temperature modifications as needed.

SECURITY & RISK MANAGEMENT

QLS sets the benchmark for pharmaceutical transportation security. As a TAPA TSR Level 1 Certified carrier, we combine advanced technology, proven security processes, and 24/7 shipment oversight to help ensure your products remain safe, secure, and compliant throughout the entire supply chain.

By employing these advanced security measures, QLS ensures that your products are protected from start to finish, providing you with peace of mind and reliable service.

A row of white semi-trucks parked outdoors under a partly cloudy sky.
A large white QLS logistics truck parked inside a spacious industrial warehouse with multiple garage doors and windows, visible ceiling pipes, and shelves in the background.

ASSET BASED SOLUTIONS

QLS is a rapidly expanding asset-based company dedicated to providing the flexibility and reliability needed to meet and exceed our customers' expectations. Our extensive and diverse fleet includes:

All trailer interior (Versitech) walls are FDA compliant.

Our commitment to maintaining a state-of-the-art fleet ensures that we can deliver tailored solutions to accommodate a wide range of shipping requirements.